Project Profiles

Before-and-after examples of custom plastic fabrication builds for regulated labs and process facilities.

Pharmaceuticals | June 18, 2025

Acedemic Facility With Limited HVAC Capacity

When a new lab was approved for this upstate NY facility there became an immediate concern of the available HVAC capacity, cost of an upgrade and of course sustainability initiatives and the impact of adding to the building EUI.

Preview: Challenges/Objectives, Solutions/Key Features & Benefits

Pharmaceuticals | June 18, 2025

Biotech facility looking for precision weighing and wash down compatible materials

When throughput increased and precision weighing was needed, PCI was able to design and manufacture a hood that met design, and material requirements while maintaining accuracy with safety in mind

Preview: Challenges/Objectives, Solutions/Key Features & Benefits

Pharmaceuticals | June 18, 2025

Animal Research Facility - Dumping & Sterilization Station

When costs of hazardous disposal of animal cages increase YoY and the need for an enclosure was needed to sterilize cages before disposal, PCI worked with the customer to design and manufacture the perfect enclosure to meet safety, ergonomic and functionality requirements.

Preview: Challenges/Objectives, Solutions/Key Features & Benefits

Ready To Plan Your Lab Or Cleanroom Build?

Let’s scope your requirements and recommend the right plastic systems, fume hoods, enclosures, and high‑purity tanks aligned to your compliance and timeline.